Dipper Lake Pipe Installation at Nine Mile River Trail - Sunday Nov.14

Volunteer work day at Nine Mile River Trail Sunday Nov.14 1:00-4:30pm.

The Dipper Lake section is in pretty good shape, except for one obstacle. There is a small ditch/stream that crosses the trail. It is possible to step or ride over, but with a little difficulty. This weekend we’re going to lay a pipe that will allow the water to flow, and cap it with rocks and dirt to make a better crossing over the ditch/stream. This will make the whole Dipper Lake section usable, and we can start promoting it as part of the trail system.

The better weather day is Sunday, our work day will be Sunday Nov.14 at 1:00-4:30pm. We’re planning to ride in starting at 1:00. It’s a 30-minute ride to the woods road intersection to pick up tools, and then about a 20-minute walk to the work site on the Dipper Lake Trail. We’ll plan to work until about 4:00 and then head out.

Feel free to walk in and meet us, come late, and leave early. Any time that you can contribute makes a big difference.

2 Likes

Not sure if you noticed that the Macintosh Fondo has been moved to Sunday. A little conflict of interest.

Yes, I noticed that. Still doing a work day - wanting to keep up the momentum on our trail work and complete some projects while we can before the cold weather sets in and the ground freezes. I’m not expecting too many mountain bike volunteers this weekend, but I thought I’d post anyway. :slight_smile:

5 Likes

Many hands make light work but even one or two can make a difference for us at nine mile

There’s even cookies

3 Likes

Pipe moving out:

Before:

After:

9 Likes