We are waiting on final approval for some grants. Work that we’re hoping to be completed in 2019, depending on grant approvals:

  • finish approaches to rebuilt boardwalk C20
  • drainage work in “mud alley” - the perpetually wet section between bog corner, and the corner along the ravine that leads to the rock bridge
  • rebuild the water crossing boardwalk on Hemlock loop
  • repair boardwalks on Hemlock loop
  • upgrade front (Pitcher Plant) loop to be wheelchair and stroller accessible
  • rebuild boardwalk C21 - the boardwalk after the rebuilt bridge C20

Trailflow has been engaged for this work.

4 Likes
  • finish approaches to rebuilt boardwalk C20
  • drainage work in “mud alley” - the perpetually wet section between bog corner, and the corner along the ravine that leads to the rock bridge

Those 2 items are carried over from grants/work last Fall and should be completed this Spring :slightly_smiling_face: