Next work day at Nine Mile River Trail is ***Changed to Saturday July 3 at 10:00am.
We’re going to continue working on our log benches and log “skinny” feature.
We’re going to be doing chainsawing, wood work, deadfall, stump and brush clearing, digging, and moving dirt and rocks.
We have tools, but an extra chainsaw, wood working and digging tools would be helpful.
We’re planning to ride our bikes in to the work site, but feel free to walk in and meet us. The work site is about a 20-minute ride or 40-minute walk along the main trail.