# Second Lake Trail construction

**URL:** <https://ecmtb.net/t/second-lake-trail-construction/3366>\
**Category:** Bicycling\
**Created:** [September 20, 2015, 2:40pm UTC](https://ecmtb.net/t/second-lake-trail-construction/3366 "2015-09-20T14:40:37Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Rockhopper](https://ecmtb.net/user_avatar/ecmtb.net/rockhopper/32/1072_2.png) [@Rockhopper](https://ecmtb.net/u/Rockhopper)\
**Post date:** [September 20, 2015, 2:40pm UTC](https://ecmtb.net/t/second-lake-trail-construction/3366/1 "2015-09-20T14:40:37Z")

</div>

For the Lower Sackvillains (Sackvillagers?)… this may be old news.

The Second Lake Trail has been extended. We used to ride in the extension down to a clearing by the lake - from there, you could ride a steep gravelly hill to the end of Metropolitain Ave. There’s now a less steep climb that goes on to the end of Armcrest Drive, with a turnoff to the top of the old climb to Metropolitain Ave. All graded crusher dust/gravel doubletrack.

A new parking lot has also been built (was not open as of Sept.14) on the other side of the old parking area on First Lake Dr.
