# Work Day at Nine Mile River Trail - Sunday April 18

**URL:** <https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344>\
**Category:** Events\
**Created:** [April 16, 2021, 2:00am UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344 "2021-04-16T02:00:00Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![Rockhopper](https://ecmtb.net/user_avatar/ecmtb.net/rockhopper/32/1072_2.png) [@Rockhopper](https://ecmtb.net/u/Rockhopper)\
**Post date:** [April 16, 2021, 2:00am UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344/1 "2021-04-16T02:00:00Z")

</div>

Volunteer work day this Sunday at 9:30am-1:00pm. We will work on drainage and mud issues at the section after the boardwalk with the handrails (about a 20-minute walk in).  
We have tools, but if you have a wheelbarrow and digging tools, they would be helpful.  
Feel free to come late or leave early. Any time that you can contribute would be great!

 ![image](https://ecmtb-uploads-bucket.s3.dualstack.us-east-2.amazonaws.com/original/2X/b/be2fefe6f24350451eb670541272d2d5e795ccda.jpeg) ![image](https://ecmtb-uploads-bucket.s3.dualstack.us-east-2.amazonaws.com/original/2X/1/1e01b0537d80922107f7d3cfb1a0d0fc86945c75.jpeg)

---

<div class="post-metadata">

**Author:** ![Rolls](https://ecmtb.net/user_avatar/ecmtb.net/rolls/32/20889_2.png) [@Rolls](https://ecmtb.net/u/Rolls)\
**Post date:** [April 17, 2021, 9:13pm UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344/2 "2021-04-17T21:13:33Z")

</div>

Bump

---

<div class="post-metadata">

**Author:** ![Rockhopper](https://ecmtb.net/user_avatar/ecmtb.net/rockhopper/32/1072_2.png) [@Rockhopper](https://ecmtb.net/u/Rockhopper)\
**Post date:** [April 17, 2021, 10:49pm UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344/3 "2021-04-17T22:49:33Z")

</div>

Forecast calling for showers. Work day still on for tomorrow.

---

<div class="post-metadata">

**Author:** ![Rockhopper](https://ecmtb.net/user_avatar/ecmtb.net/rockhopper/32/1072_2.png) [@Rockhopper](https://ecmtb.net/u/Rockhopper)\
**Post date:** [April 19, 2021, 2:22am UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344/4 "2021-04-19T02:22:57Z")

</div>

Another great work day! Thanks so much, volunteers!

This is before. Actually significantly improved since the drain was dug a couple of weeks ago.

 ![IMG_1733](https://ecmtb-uploads-bucket.s3.dualstack.us-east-2.amazonaws.com/original/2X/f/f823b9e549198d1419ea8231f1a5b2782a8b3244.jpeg)

After:

 ![IMG_1771](https://ecmtb-uploads-bucket.s3.dualstack.us-east-2.amazonaws.com/original/2X/1/1e7f6c01a94ac000f99c80449fbf9a869823bdc1.jpeg)

And the crew:

 ![IMG_1772](https://ecmtb-uploads-bucket.s3.dualstack.us-east-2.amazonaws.com/original/2X/0/011d9f59291d9d878c9caf6803885754eecf8a78.jpeg)

---

<div class="post-metadata">

**Author:** ![JeffV](https://ecmtb.net/user_avatar/ecmtb.net/jeffv/32/2029_2.png) [@JeffV](https://ecmtb.net/u/JeffV)\
**Post date:** [April 19, 2021, 11:11am UTC](https://ecmtb.net/t/work-day-at-nine-mile-river-trail-sunday-april-18/11344/5 "2021-04-19T11:11:00Z")

</div>

All the work went into cutting a new french drain and bigger sump on the left. The berm was a fun bonus. It will be dry in August, lol. That clay is soo soupy.
