Work Day this Sunday (Nov.29) at Nine Mile River Trail, 9:30am. The last few work days have been very productive. We’re trying to get more ground work in before the winter freeze. Project for this work day - drainage work on the hill above the C21 boardwalk (bridge after the one with the handrails). About a 20-minute walk or 10-minute ride in. We will have tools on site, but if you have digging tools or a wheelbarrow, they would be appreciated.
Forgot to include the time - 9:30am. In accordance with Nova Scotia COVID-19 guidelines, we will keep teams to 5 people or less, and maintain social distancing as much as possible.
2 Likes
Was wondering when you were going to notice that. Might be late
1 Like
See you in there.
1 Like
Very productive work day today. More drainage and rockwork, and hopefully less mud! Thanks to everyone who came out! It’s really appreciated.
6 Likes