Work evening at Nine Mile River Trail this Monday at 7:00PM. Planning to do root capping and boardwalk work. Come on out!
1 Like
Capped a couple of more loops on the front section. Supported and secured deckboards on boardwalks C1, C2, P5, and P2.
3 Likes
We only walked the front loop, so we didn’t see a lot of the trail. It was fairly wet. However, the trail gets a little dryer every time we’re in. Every work day or evening we try to improve drainage even a little, but there are still lots of wet and muddy places.
1 Like