Dipper Lake Drainage and Branch Clearing - Nine Mile River Trail Saturday Nov.20

A little finish work to do on the installed pipe from last weekend. We could use another small pipe to drain another water hole on the Dipper section, and just make sure that our branches are cleared back. We’ll take care of those items this weekend. If we have any time after that, we’ll get back onto the drainage and tread upgrade work on the way to the lake.

Since the forecast is calling for cold weather overnight on Friday, we’ll do a slightly later start to let the trail defrost -

Saturday Nov.20, 10:00am-1:30pm.

As usual, we will have tools on site. We will ride mountain bikes in, but feel free to walk in, come late and/or leave early. Any volunteer time you can contribute makes a difference!

1 Like

8 Likes