Volunteer work day this Saturday Aug. 24 at 9:30am.
We’re going to install a “Balance Beam” log ride technical trail feature.
The work will require some chainsawing, wood work, grass trimming, digging and dirt work. If we have enough volunteers there is some dirt work nearby that needs doing, and cleanup of old boardwalk debris.
The work site is near the current Balance Beam feature, about a 25-minute walk from the trailhead. Janet and I will be riding our mountain bikes in, about a 15-minute ride.