Work Day at Nine Mile River Trail - Saturday Sept.18

Work day this Saturday, Sept. 18.

We’re planning to replace 2 broken boards on the second last and last boardwalks on the Comeau trail near the lake.

We’re going to walk the lumber out to the work site, bungee’d to mountain bikes, starting at 9:30am.

Feel free to meet us in there. It’s about an hour walk to the work site, or about a 30-minute mountain bike ride.

We will have tools. Rubber boots would be useful as one of the boardwalks is in a wet area.


1 Like